Bulkhead Permit Guide: Federal, State and Local Layers

How bulkhead and seawall permits typically work in layers, including Corps Section 10 and 404 authority, the 2026 Nationwide Permits, state and local review.

Last reviewed
Reading time
5 min read

Short answer

Bulkhead work in or near tidal and navigable waters is commonly reviewed in layers: the U.S. Army Corps of Engineers under Section 10 and Section 404, a state coastal or environmental agency, local building offices and any HOA. The 2026 Nationwide Permits took effect March 15, 2026. Only the permitting authorities can say what a project needs.

Key takeaways

  • Federal regulations list bulkheads among structures in navigable waters regulated under Section 10 of the Rivers and Harbors Act; fill in waters of the United States falls under Section 404 of the Clean Water Act.
  • The 2021 Nationwide Permits expired March 14, 2026, and were replaced by the 2026 Nationwide Permits, effective March 15, 2026, through March 15, 2031.
  • NWP 13 (Bank Stabilization), NWP 3 (Maintenance) and NWP 54 (Living Shorelines) are the federal general permits most often discussed for shoreline work, each with limits and regional conditions.
  • States add their own permits, water quality certifications and coastal consistency reviews; local governments and HOAs may add more.
  • Ask each agency directly; never assume a project is exempt.

Permits for bulkheads and seawalls are rarely a single application. Shoreline work sits where federal waters, state-owned submerged lands, environmental protections and local building codes meet. Each layer can have its own review, conditions and timeline.

This guide explains how those layers commonly fit together, what changed with the federal Nationwide Permits in 2026, and what to ask each agency. It does not determine whether any specific property needs a permit. Only the permitting authorities can do that. For state-by-state agency contacts, use the permit navigator.

The federal layer

Section 10 and Section 404

Two federal laws are central to shoreline construction, and the U.S. Army Corps of Engineers administers permits under both.

  • Section 10 of the Rivers and Harbors Act of 1899 covers structures or work in or affecting navigable waters of the United States. The Corps' regulations at 33 CFR Part 322 define "structure" to include, among other things, a bulkhead, revetment, riprap, pier and breakwater.
  • Section 404 of the Clean Water Act regulates the discharge of dredged or fill material into waters of the United States, including wetlands. EPA describes the Corps as administering the day-to-day program, including individual and general permit decisions.

Which authority applies depends on where the structure, the work and any fill are located, which is why the Corps district is the right first contact for the federal layer.

Individual permits and general permits

The Corps' regulations describe two broad paths. An individual permit follows a case-by-case evaluation and public interest review; a letter of permission is a type of individual permit issued under abbreviated procedures. A general permit is issued on a nationwide or regional basis for categories of activities with only minimal individual and cumulative environmental impacts. Nationwide Permits are one kind of general permit; regional general permits are another.

The 2026 Nationwide Permits

The Corps published its final action reissuing the Nationwide Permits (NWPs) in the Federal Register on January 8, 2026. Key points from that notice:

  • The 2026 NWPs, general conditions and definitions took effect March 15, 2026, and expire March 15, 2031.
  • The 2021 NWPs expired March 14, 2026. Activities authorized under a 2021 NWP that had commenced or were under contract to commence by that date have until March 14, 2027, to be completed. Otherwise, reauthorization under the 2026 NWPs is required.
  • The action reissued 56 existing NWPs and added one new NWP, for 57 in total.

Three NWPs are most often discussed for shoreline walls:

NWPCoversSelected terms in the 2026 text
NWP 13, Bank StabilizationErosion control including bulkheads, riprap, revetments, sills and vegetative methodsNo more than 500 feet along the bank unless waived; a waiver cannot be issued for a bulkhead longer than 1,000 feet. No more than an average of one cubic yard per running foot below the ordinary high water mark or high tide line unless waived. Pre-construction notification required in listed cases. Authorities: Sections 10 and 404.
NWP 3, MaintenanceRepair, rehabilitation or replacement of previously authorized, currently serviceable structures or fillCovers storm-damaged structures if work begins or is under contract within two years of the damage, with possible waiver after catastrophic events.
NWP 54, Living ShorelinesLiving shorelines in coastal waters along low- to mid-energy shoresStructures and fill generally no more than 30 feet waterward of mean low water in tidal waters and no more than 500 feet along the bank unless waived.

The 2026 NWP 13 also explicitly authorizes incorporating nature-based features into new and existing bank stabilization, such as textured seawall surfaces, rock clusters or small reef structures next to a bulkhead.

Regional conditions, 401 certification and coastal consistency

National NWP terms are not the whole story. The Federal Register notice explains that Corps division engineers add regional conditions, and that state water quality certifications and Coastal Zone Management Act consistency concurrences can add further conditions. A project that fits the national text may still face district-specific limits. Ask the Corps district regulatory office which conditions apply.

The state layer

Most coastal states run their own shoreline permitting, often coordinated with the Corps. Three examples show the range:

  • North Carolina. Under the Coastal Area Management Act, the Division of Coastal Management issues major, general and minor permits. General permits are used for routine projects that usually pose little or no threat to the environment; major permits apply to activities that require other state or federal permits, among other triggers.
  • Maryland. The Department of the Environment's Wetlands and Waterways Protection Program lists putting in a bulkhead among tidal wetland activities that generally require a permit, and requires a joint application form for tidal wetland applications, with program work coordinated with the Corps.
  • Florida. The Department of Environmental Protection oversees the Environmental Resource Permit program statewide and the State 404 Program, which assumed federal dredge-and-fill permitting for certain waters. State-owned submerged lands can raise separate authorization questions.

Other states have their own agencies and rules. The permit navigator lists them where we have verified official pages.

The local layer

Cities and counties commonly require building permits for structural work, and some have their own shoreline, floodplain or setback rules. Some local governments also issue certain state permits under delegation, as North Carolina does with CAMA minor permits. Call the local building department early, because local review can depend on approvals from other layers.

Homeowners associations and private rules

Many waterfront communities have architectural review requirements, approved materials, or shared-wall arrangements with neighbors. Deed restrictions and easements can also matter. Get any approval in writing before construction.

Questions to ask each authority

  1. Does this work require a permit or other authorization from your agency, and which type?
  2. Does the location fall within any special area, such as wetlands, submerged lands or a protected habitat zone?
  3. Are there limits on how far waterward a replacement wall may be placed?
  4. What drawings, surveys or engineering are required with the application?
  5. Are there work windows, turbidity controls or other conditions to expect?
  6. How long does review typically take, and do other agencies need to sign off first?
  7. Who may apply: the owner, the contractor or an authorized agent?

Who handles the paperwork

Permit responsibility should be written into the contract. The Federal Trade Commission lists a contractor asking the homeowner to get the building permits as a warning sign of a possible scam. Many marine contractors and engineers prepare applications as part of their services; confirm what is included when you compare contractor quotes, and see how to hire a marine contractor. Permit costs and timelines also affect your budget; see factors affecting bulkhead pricing.

Frequently asked questions

Do I need a permit to replace my bulkhead?

Many bulkhead projects require one or more permits, but the answer depends on location, the work and current rules. Contact the Corps district, your state coastal or environmental agency and your local building department before work begins.

Are the 2021 Nationwide Permits still valid?

No. They expired March 14, 2026. The Corps reissued the Nationwide Permits in a final action published January 8, 2026, effective March 15, 2026. Some activities authorized under the 2021 permits that were underway or under contract by March 14, 2026, have until March 14, 2027, to finish.

What is NWP 13?

Nationwide Permit 13 authorizes bank stabilization activities, including bulkheads, that meet its terms, such as being no more than 500 feet long unless waived. Pre-construction notification is required in certain cases, and regional conditions vary by Corps district.

Who is responsible for getting the permit, me or the contractor?

It varies, and the contract should say. The Federal Trade Commission lists a contractor asking the homeowner to get the building permits as a warning sign, so clarify responsibility in writing.

Does my HOA need to approve a bulkhead?

Many communities have architectural review rules for waterfront structures. Check your HOA's governing documents and get any approval in writing before construction.

Permit Navigator

See which agencies may be involved

Pick your state and the type of work to get a research checklist with official agency links, federal considerations, and questions to ask before construction.

Open the Permit Navigator

Sources

We cite public agencies, universities, and technical publications. See our editorial standards.

  1. 1Reissuance and Modification of Nationwide Permits; Final Action (91 FR 768, January 8, 2026) — U.S. Army Corps of Engineers, Federal Register (GovInfo). Accessed November 3, 2026.
  2. 233 CFR Part 322: Permits for Structures or Work in or Affecting Navigable Waters of the United States — Code of Federal Regulations (GovInfo, 2024 edition). Accessed November 3, 2026.
  3. 3Permit Program under CWA Section 404 — U.S. Environmental Protection Agency. Accessed November 3, 2026.
  4. 4Types of Permits (Coastal Area Management Act) — North Carolina Department of Environmental Quality, Division of Coastal Management. Accessed November 3, 2026.
  5. 5Wetlands and Waterways Protection Program — Maryland Department of the Environment. Accessed November 3, 2026.
  6. 6Submerged Lands and Environmental Resources Coordination Program — Florida Department of Environmental Protection. Accessed November 3, 2026.
  7. 7How To Avoid a Home Improvement Scam — Federal Trade Commission, Consumer Advice. Accessed November 3, 2026.

Bulkhead Walls Editorial Team

Our editorial team researches and writes homeowner-focused guides from public agency, university, and engineering sources. Articles are general education and are not a substitute for a site-specific evaluation by a licensed professional.

Educational guidance only. This information is general and is not a structural assessment, engineering advice, or a permitting determination. Conditions at every waterfront are different; consult a licensed marine contractor or professional engineer about your wall.